THE CHALLENGE
Waterway with a Future
In April 2014, the Waterways and Shipping Administration Rheine, Germany, put the second chamber of the new twin lock Münster into operation. Now the waterway is prepared for the future requirements of inland shipping. All motion sequences of the lock are being realized and controlled by means of an electro-hydraulic system solution from Rexroth. The new technology is significantly safer, more powerful, environmentally friendly, and requires less maintenance than previous solutions.

 

OUR SOLUTION

 

RESULTS
Solved with
  • 16 hydraulic aggregates and hydraulic miter gate cylinders
  • Axial piston displacement pumps
  • Integrated position measurement system CIMS Mk IV